![fission uranium corp stock price fission uranium corp stock price](https://charts.equityclock.com/seasonal_charts/FCUUF_geo.png)
The R780E zone and R1620E zones make up the eastern region of the Triple R deposit.
![fission uranium corp stock price fission uranium corp stock price](https://fissionuranium.com/site/assets/files/2768/2021-04-27-fig1.jpg)
R00E is located 485 m to the east along strike of R840W and is drill defined to 115 m in strike length. R840W is located 515 m to the east along strike of R1515W and has a drill defined strike length of 430 m. R1515W is the western-most of the zones and is drill defined to 90 m in strike-length, 68 m across strike and 220 m vertical and where mineralization remains open in several directions. The R1515W, R840W and R00E zones make up the western region of the Triple R deposit and are located on land, where overburden thickness is generally between 55 m to 100 m. The discovery hole was announced on Novemwith drill hole PLS12-022, from what is now referred to as the R00E zone. Through successful exploration programs completed to date, Triple R has evolved into a large, near surface, basement hosted, structurally controlled high-grade uranium deposit. From west to east, these zones are: R1515W, R840W, R00E, R780E and R1620E. PLS Mineralized Trend & Triple R Deposit Summary: Uranium mineralization of the Triple R deposit at PLS occurs within the Patterson Lake Conductive Corridor and has been traced by core drilling over 3.18 km of east-west strike length in five separated mineralized "zones" which collectively make up the Triple R deposit. 6 geotechnical drillholes and pumping well pulsed test complete. Detailed design of the Tailings Management Facility is in progress – field assessment work for geotechnical and hydrogeological aspects is complete, aggregate sourcing study is complete, and constructability, pit design and liner design are in progress. Uranium process design criteria is complete, and process flow design is in progress. Mine design for the R780E zone well underway. Detailed design for the decline and vent shafts is underway, and underground Mineable Stope Optimiser (MSO) work has been completed for the R780E zone and is in progress for the R840W zone. Trade-off Study on mine access and mining methods is complete. Initial leach tests are completed, bulk leach tests and variability leach tests are in progress, comminution tests are in progress and preparation work for the solvent extraction mini pilot test is in progress. Hydrogeological test work is complete and hydrogeological modelling and assessment for the decline and mine production areas is in progress. Feasibility Study Progress: All geotechnical test work on soil and rock samples have been completed, and geotechnical assessment work on the R840W and R780E zones is in progress. Additionally, and of particular note, detailed engineering studies and planning of the proposed mine design are now in progress and are now well advanced. The Company has achieved multiple feasibility study milestones, including completion of field work for geotechnical, hydrogeological, and metallurgical purposes.
Fission uranium corp stock price update#
provided an update on the Feasibility Study work at its 100% owned PLS property in Canada's Athabasca Basin region. Provides an Update on the Feasibility Study Work At PLS Property in Canada's Athabasca Basin RegionįISSION URANIUM CORP.